This page shows the actual planning status of the n scale anniversary event in Naumburg. Last update: 22.8.2008

Concept

See Fremo announcement page.

Arrangement

The main track sections of the arrangement represent separated railway administrations. They are connected by branches and if necessary by stations. Some connections are realized by fiddle yards.

Track sections

The following track sections are planned:

Name of section / GroupTechnical conditions Modules / stationsRemarks / Contact person
Tr.Profile
/ Wheel
Coup.RALand Mod.Part.
Main track 1 (Fremo-N, AG Vorbild und Modell) 1-2Code 40 / NEMNemRADs.u.s.u. Karlsruhe-Durlach, Abzw.Kreuzbruch, Wittingen Süd, Sickte, Sonneberg Double tracked up to Wittingen Süd, single tracked up to Sonneberg. The track sections "local line Kassel-Naumburg" and Reichsbahn/Poland start here.
Main track 2 (Fremo-N, N-RE, Zababov) 2Code 40 / NEMNemRADs.u.s.u. Karlsruhe-Durlach, Ziegelei, (Emondsfeld / Schwenkheim) Two tracks in parallel with large station. The track sections N-RE/Czech Republic and Finescale start here.
Local line Kassel-Naumburg (Fremo-N, AG Vorbild und Modell) 1Code 40 / RP25Nem-Ds.u.s.u. Kassel-Wilhelmshöhe West, (Abzw.Kohlenstraße), Nordshausen, Elgershausen, Hoof, Sand, Balhorn, Naumburg Copy of the Local line Kassel-Naumburg.
This track section makes a contact to the event location.

Jörg Kleinau
German Reichsbahn (Fremo-N) 1Code 40 / RP25Nem-D256 Sonneberg, Bismark, Kleinbrüchter, Nordkurve -

Michael Köhler
Poland (N-Orma) 1Code 55 / NEMNem-PL4010- 15 (Sonneberg), Zwolakow Duzy, Przemowo-Kopalnia, Markowka, Techniczny Connection via border station Sonneberg.

Dan Buchtela
fiNescale 1Code 40 / fiNeFs-D4010- 15 Schwenkheim, Lippelsdorf, Heberndorf, Waimes, Clausthal, Altenau 1:1 wagon exchange in Schwenkheim from NEM/RP25 to fiNe planned

Arrangement: Jens Emmermann
Timetable: Henk Oversloot
Belgium (fiNescale) 1Code 40 / fiNeFs-B4010- 15 Waimes, Splitveld Fabriek, Montzen Grens Connection via border station Waimes

Arrangement: Jens Emmermann
Timetable: Henk Oversloot
N-RE 1Code 55 / NEMNem-D2510- 15 Emondsfeld, Chemie-Anlagen-Bau, Sägewerk Maleis, Reitershausen, Fördertechnik, Stahlwerk, Pecka -

Michael Gruß, Michael Maleis, Frank Janson
Czech Republic (Zababov) 1Code 40 / NEMNem-CZ4010- 15 (Pecka), Podolí, Horni Blatna, Frankental Connection via border station Pecka (fiddle yard).

Dan Buchtela
Danmark (N-RE-DK) 1Code 55 / NEMNem-DK205- 6 (Karlsruhe-Durlach), Nordfaxe, Torup, Vœmmelse-Nørremark, Steenstrup, Fredericia Connection via border station Karlsruhe- Durlach.

Jan Pilemand-Geertsen
america-N 1Code 55 / ?Nem-USA304- 5 Moonrise Yard, Coal Mine, Wheat and Barn, Appaloosa Junction, Chatteris / Erehwyna Yard No direct connection, if necessary exchange of goods via two fiddle yards (virtual transatlantic harbor)

Michael Homberg
Tr. = Tracks    Profile/wheel = minimum track profile of the modules and wheel sets useable for all modules    Coup. = Couplers (Nem=standard, Fs=finescale)    RA = Resistor axles required    Mod. = Number of modules (approx.)    Part. = Participants (approx.)

Staus of planning

From the different groups some structure/operating concepts were suggested, which should be considered regarding operating concept and areal conditions, if possible.

An area of 25x17m is available, optionally an extension area of 19x5m and a stage area of 6x15m can be used. Under the present conditions the use of the optional extension area and the stage area is planned.

The "Europe arrangement" wird be located in the hall itself. AmericaN is granted the unrestricted use of the stage. The Finescale track section will (after newest experiences: Vienenburg) be docked to the RP25 and/or NEM track section and merged into the timetable.

The goal is, to get a balanced relationship of the "module meters" of the individual groups - with consideration of the space conditions, operational necessities, received concepts, participants, organization, desires (prioritization sequence of the coordinators).

The coordinators ask for understanding that not all announced modules can be considered in the arrangement. The concept phase and lively discussions in the initial stage of the meeting had created expectations, which can not be fulfilled regarding the size of the available area. Here is to be reminded again of the goals of the meeting. The coordinators are sure that these goals are convertible, if each participant brings along compromise readiness.

Timetable

The goal is to develop a common timetable which includes the locomotive change at the borders of the different track sections (PL, CZ, DR, railways, with restriction finescale). This timetable consists of individual "section timetables", which are connected by "interzone trains" or international trains. For this a coordinated concept must be developed.

The timetable coordinator produces the timetable of the main line. The different track sections branch from this main time table. Based on this the operation on the track sections can be developed. Here delivery times are indicated, which can be used by the timetable planners of the track sections. Since the plant stations of any track section mostly belong to a certain group, the production of the section timetables has to be done by the contact persons of the different groups.

For the creation of a timetable in this complexity, station data sheets must be provided mandatory for all plant stations! All station data sheets including those sent to the coordinators are sent and/or passed to the timetable coordinator of the main line. Please send all station data sheets, even those of the sections, to the timetable coordinator! So "continuous" trains can also be planned.

Wagon needs

Here the same is valid, as for the timetable. In order to create a wagon circulation and thus a meaningful freight traffic in this complexity, station data sheets must be provided mandatory for all plant stations.

Time flow of the preparations

SectionDateResponsibleRemarks
Rough planning, concept, group competence-Ubbo Lanske-
Module collection (CAD)starting from 1.3.2008Michael Köhler-
Provisorial arrangement planningstarting from 1.3.2008Michael Köhler With clarifying of necessary equipment (DCC, telephone, if necessary also wagon material)
Module registration of the different groupsup to 1.6.2008Each group by itself, gladly earlier!With station data sheet for each station!
Final arrangement planningup to 1.7.2008Michael Köhler, Jens Emmermann-
Planning of timetableup to 1.8.2008Michael Gruß, Michael Maleis-
Planning of wagon needs and freightup to 15.8.2008Michael Gruß, Michael Maleis-
Reserveup to 1.10.2008...-
Eventstarting from 2.10.2008allSee the following table for details

Time flow of the event

Note: There is a detailed assembling time plan for each module in the yahoo group Naumburg2008. Please check there, when your module is needed! In case of diffculties downloading this time plan please contact the coordinators (mail address at the bottom of the official Naumburg 2008 annoucement page).

DateBeginningEnd ActionRemarks
Thursday, 2.10.200810:00am10:30amAssembling KDU (main) Assembling starts with Karlsruhe-Durlach
  "10:30am11:10amAssembling branch KDU-SO (main SO)10:55 Wittingen Süd, 11:10 Posten 53
  "10:30am11:25amAssembling branch KDU-EMF (main SW)10:50 Ziegelei, 11:25 N-RE 247
  "11:00am1:45pmAssembling branch Wittingen Süd-Naumburg (KNE)11:25 Kassel-Wilhelmshöhe, 12:05 Hoof, 13:35 Naumburg
  "11:15am12:15amAssembling SON (DR)Station Sonneberg
  "11:30am4:00pm ?Assembling branch fiNescale (FS)-
  "11:30am2:45pmAssembling branch EMF-Pecka (DB)12:10 Sägewerk, 12:40 Reitershausen, 13:20 Fördertechnik, 14:10 N-RE-038, 14:25 Stahlwerk
  "12:00am2:00pmAssembling branch KDU-Frederica (DK)12:20 Nordfaxe, 12:50 Torup, 13:25 Steenstrup
  "12:00am12:05amAssembling branch KDU-Schattenbach (main NW)-
  "12:15am1:40pmAssembling branch SON-Nordkurve (DR)12:35 Bismark, 13:00 Kleinbrüchter
  "12:20am2:00pmAssembling branch SON-Zwolakow Duzy (PKP)13:10 Przemowo-Kopalnia, 13:25 Zwolakow Duzy, 13:30 Markowka, 14:00 Techniczny 1
  "2:15pm4:30pmAssembling branch NRE038-Frankental (CSD)14:30 Podoli
  "4:30pm6:00pm ?Assembling cablingpower, loconet, telephone, ...
  "starting from eveninguntil it runs Test operation (?)...
Friday, 3.10.2008starting from 9:00amto 10:00pm Operation...
Saturday, 4.10.2008starting from 9:00amto 10:00pm Operation...
Sunday, 5.10.2008starting from 9:00amto 1:00pm Operation...
Sunday, 5.10.2008starting from 1:00pmuntil evening Disassembling...

Event Location

"Haus des Gastes", Hattenhäuser Weg 10-12, 34311 Naumburg, Germany

Naumburg: Bild 1   "Haus des Gastes": Bild 2
Hall: Bild 3 Bild 4 Bild 5 Bild 6

Links*

* For the contents of the specified web pages only the respective author is responsible.
Fremo-N AG Vorbild
und Modell
N-RE, AK5
and AK1919
fiNescale Zababov (Czech Republic) N-Orma (Poland) N-RE Danmark Fremo Italy america-N Imprint